Sturgeon Point pool rebuild project can be viewed in the picture slider below. The pool reopened the weekend of 6/20/2020.
11/30/2019 Pool removal
11/30/2019 Pool removal
11/30/2019 Pool removal
5/4/2020 Start pool installation
5/5/2020
5/6/2020
5/7/2020
5/8/2020
5/11/2020
5/12/2020
5/13/2020
5/14/2020
5/14/2020
5/14/2020
5/14/2020
5/19/2020 Plumbing and wiring
5/20/2020 Plumbing work
5/21/2020 Pool walls backfilled
5/22/2020 Poured some of the bottom
5/22/2020
5/23/2020
5/26/2020
5/27/2020 Steps added
5/30/2020
6/1/2020
6/3/2020
6/3/2020
6/4/2020 First coat of paint
6/5/2020 Second coat of paint
6/11/2020 Filling with water
6/12/2020
6/21/2020 It's open!
8/25/2020 Install pool cover