Pool Reconstruction Sturgeon Point pool rebuild project can be viewed in the picture slider below. The pool reopened the weekend of 6/20/2020. 11/30/2019 Pool removal 11/30/2019 Pool removal 11/30/2019 Pool removal 5/4/2020 Start pool installation 5/5/2020 5/6/2020 5/7/2020 5/8/2020 5/11/2020 5/12/2020 5/13/2020 5/14/2020 5/14/2020 5/14/2020 5/14/2020 5/19/2020 Plumbing and wiring 5/20/2020 Plumbing work 5/21/2020 Pool walls backfilled 5/22/2020 Poured some of the bottom 5/22/2020 5/23/2020 5/26/2020 5/27/2020 Steps added 5/30/2020 6/1/2020 6/3/2020 6/3/2020 6/4/2020 First coat of paint 6/5/2020 Second coat of paint 6/11/2020 Filling with water 6/12/2020 6/21/2020 It's open! 8/25/2020 Install pool cover